Wednesday, November 9, 2011

CRIT//

The Final crit was a chance to get a final feedback from the tutors.
The main issues brought up were:
- Mainly the aesthetic of the building. Right now it is not as 'iconic' and it should be. For me, not all political buildings need to be of a specific 'traditional' architecture. Nonetheless, there is more opportunity for more aesthetics, so that is something that will be worked on
- Have the topography move with the building. Have the architecture more 'flexible' by moving the building with the moving topography
- Needs to make more of a statement!
- Look more like a political building
- Change floor plans - too many lifts, don't need as many toilets (do draft floor plan)
- Hand draw section showing structure
- Lift in section (fix)
- Fill in empty spaces, temporary layouts
- Thermal chimney.

No comments:

Post a Comment