The following sketch shows a construction section showing a rough diagram of how the structure will go together. With a 200mm slab and curtain walling. The T-Bar roof is to allow for suspended ceilings to allow for services (HVAC, plumbing etc). Scale 1:50


This is the 2-3 floor plan with a rough plan of a temporary layout for temporary exhibitions. The walls would be of 90mm thick stud wall (inclusive of plasterboard of either side) with wall design to suit the exhibition. For example, if indents are needed in the walls for paintings or displays they will need to be detailed before construction. Exhibitions are to be for around 3 months, and construction to be easily demolished.